Codrilla ROM Dump Station

Project Details

Project: Codrilla ROM Dump Station
Client: Thiess / Sedgman Joint Venture
Service Type: Engineering Fabrication and On-site Installation
Value: $2.0m
Completion: October 2012

Project Summary

Melco Engineering were engaged by the Thiess / Sedgman Joint Venture to undertake the supply, manufacture and installation of a Run of Mine (ROM) Bin Dump Station at the Codrilla coal mine.

The ROM Dump Station was inclusive of a dump hopper, wingwalls, bin walkways, grizzly, level detector bracket, feeder discharge chutes, dust suppression system and support structure inclusive of grating and handrailing. Works completed throughout execution included plate, piping, structural and mechanical installations.

Melco project managers worked closely with the client to monitor and report on project progress in respect of key deliverables and execute effective management of emergent works.

Various standards complied with throughout the execution included but was not limited to AS1554.1, AS4100, client specifications and various surface treatment standards.

The Melco scope included fabrication, assembly, transport and site installation of the newly designed ROM Dump Station encompassing 11,000 labour hours.